Arbitrage
The storage buys energy on the day-ahead market in the cheap hours and sells it in the expensive ones. What this brings in a year at real prices, with grid tariffs and commission, and when it pays back.
Net income per year
—UAH
Payback
—
- Sold from storage
- —MWh
- Cycles per year
- —
- Average spread
- —UAH/MWh
- Per 1 MWh of capacity
- —UAH/year
- Loan payment
- —UAH/month
- Interest over the whole term
- —UAH
- Left after payments
- —UAH/year
- Income covers payments
- —times
Loan
How the income adds up
UAH a year
Project cost
—
A typical day
- Buying from the grid
- Charging from the sun
- Selling from storage
- Sun to the grid
- Price
MW; price on the right
Income by month
- Net income
UAH a month
How the income depends on the discharge duration
- Your configuration
- Another capacity at the same power
UAH a year
Money over the service life
- Accumulated income
- Not paid back yet
- Payback
UAH, cumulative
Equipment for this configuration
We will calculate it exactly from your data
Your numbers go into the request. We will work out the configuration, the substation, the grid connection and the trading schedule for your site.
How we calculate
Prices
- “Real, past year”: the hourly day-ahead market prices for the IPS of Ukraine for 27.09.2025–26.09.2026 from the JSC Market Operator website. Each day is counted separately with its own prices, and the result is scaled to the storage’s operating days. Last year does not guarantee future prices.
- “Your own”: the day is built from your cheapest and most expensive hour along the typical shape of the market: cheap at night and at midday, when the solar plants work, expensive in the morning and most expensive in the evening. By default they are the averages of the real prices.
Cycle
- One cycle: charging in the cheapest hours before 16:00, selling in the most expensive hours of the evening. Two cycles: charging at night before 6:00, selling 6:00–10:00; charging 10:00–17:00, selling in the evening. In each hour the storage takes or gives no more than its power, for as many hours as the working capacity needs.
- A cycle sells the working capacity (nominal × working share). More is bought to cover the losses: with 8% losses, 1.08 MWh is bought for every MWh sold.
- A cycle runs only if it brings income after the purchase, the tariffs and the commission.
- Trading accuracy: the calculation knows the day’s prices in advance and picks the best hours, while the trader bids before the auction and does not always hit them. So the storage is credited with the set share of the “sales minus purchases” difference, 95% by default. The grid tariffs and the trader’s commission do not depend on the accuracy.
Costs
- Distribution and transmission are paid only on the energy the storage does not return to the grid, that is on the conversion losses. The tariffs follow the oblast: NPC Ukrenergo transmission and the distribution of the oblast’s main distribution system operator under NEURC resolutions from 01.08.2026, excluding VAT; a 10 kV connection (6–20 kV, below 27.5 kV) pays class 2 distribution, 35–110 kV pays class 1, which is cheaper.
- Investment: the cost of the storage + the solar plant, if there is one + a transformer substation at about $60,000 per 1 MW + the grid connection fee. The payback is counted from the total investment.
- If you have not entered your own cost, we estimate it in dollars excluding VAT: the storage as 125 kW / 261 kWh cabinets, the solar plant as 650 W panels and 125 kW grid-tie inverters at our prices; installation, commissioning, foundations for the cabinets and the crew’s trip to your oblast at our rates; mounting structures, cable products and switchgear at average market prices.
- Connection to the grid of the oblast’s distribution system operator at the NEURC rates for 2026 (Resolution No. 2231, reliability category I, urban area), excluding VAT: for 10 kV the 6(10)20 kV rates, for 35–110 kV the 35 kV rates (at 110 kV they are lower). From 01.09.2026 storage pays for both the consumption capacity and the output capacity (Resolution No. 1356), that is the sum of the two rates: in most oblasts about 4,889 UAH per 1 kW at 10 kV and 4,050 at 35 kV. Until 01.01.2027 a transitional rule applies: half of this sum, if the conditions of Resolution No. 1461 are met. The linear part (the line to the nearest point of the grid) depends on the distance and is not included: a 10 kV overhead line costs 1.24 million UAH, a 35 kV one 2.73 million UAH per 1 km. Connection to the Ukrenergo grid follows the project estimate.
- The trader’s commission is a share of the cost of the energy bought.
- Datasheets give the LiFePO4 cycle life down to 80% of the initial capacity: over 8,000 cycles the capacity gradually falls to 80%, after that the storage keeps working, but with less. In the calculation the capacity falls linearly to 80% at the end of the cycle life, over no more than 15 years. Maintenance, insurance and taxes are not included.
- Loan: an annuity (equal monthly payments). The payback of own funds is counted from the income after the loan payments; the payback of the system with a loan is the cost plus all the interest, divided by the yearly income.
Sun
- The output of 1 kW of panels for the oblast centre is from PVGIS 5.3 (JRC, SARAH3, average of 2005–2023; crystalline silicon modules, optimal tilt facing south, system losses 14%): from 1,085 kWh a year in Lviv Oblast to 1,276 in Kherson Oblast, month by month for each oblast. With real prices the sun is real too: the hourly generation of each day of the same year from the actual weather (Open-Meteo, ERA5 reanalysis: solar radiation on the panel plane at the optimal angle and the air temperature; panel heating −0.35%/°C, system losses 14%). The reanalysis slightly overstates the radiation in cloudy weather, so each oblast’s year is brought to the long-term PVGIS level, which keeps the true pattern of sunny and overcast days and hours. This way the sun and the prices match: on sunny days the DAM price drops at midday exactly when the plant gives the most. For “Your own” prices the day is counted twice, clear and cloudy (a cloudy day gives 30% of a clear one), with their shares in the month. In any hour no more than the connection capacity goes to the grid, the storage and the sun together; the storage takes the sun above it first, the rest is lost. The substation and the connection are shared by the storage and the plant, and their cost is counted by the storage’s power. The sun that does not go into the storage is sold to the grid at that hour’s DAM price; no grid tariffs apply to it. Charging from the sun is valued at the same price: the storage takes the sun only when selling it later pays more.
- How the sun is sold: through a trader on the DAM, by a day-ahead generation forecast. Deviations from the bid are settled every hour under the Market Rules (cl. 5.17.2): a shortfall is bought at the higher of the DAM and balancing market prices plus 5%, a surplus is sold at the lower one minus 5%; there are no separate penalties or tolerances for plants on the free market. By NPC Ukrenergo imbalance prices from August 2025 to August 2026, in the generation hours a shortfall cost on average 1.9 times the DAM price, and a surplus sold at 0.53 of the DAM price; from May 2026, after the price caps were raised, 2.4 times and 0.4. A shortfall costs twice as much as a surplus, so the bids are a little below the forecast, about 95%. Deviations are counted for the trader’s whole balancing group, and storage in it covers most of the sun’s errors. The losses on deviations are the “Solar imbalance”, 5% of the solar sales by default; for a plant without storage and with a typical forecast they are 10–20%. The trader’s commission is also taken on the solar sales.