2019
3.6 MW solar plant
3.6 MW ground-mounted solar power plant, drone view- Power
- 3.6 MW
- Year
- 2019
- Status
- Operating
One contract for design, equipment, installation and grid connection. A solar plant, storage, or both together.
One contract, one point of responsibility: from technical conditions to service.
Feasibility study, detailed design, technical conditions, approval by the grid operator.
Panels, inverters, batteries and ESS cabinets from our warehouse.
Mounting, panels, cable, switchboards, ESS cabinets. Our own machinery and people.
Metering, testing, commissioning, active consumer status.
10 years on panels, 3 years on other equipment. We handle warranty claims.
Generation monitoring, scheduled maintenance and repair anywhere in Ukraine.
Indicative timelines for a 100–500 kW site. Faster for a house, longer for megawatt plants.
Site visit, analysis of a year of consumption, the connection capacity and the space. An offer with equipment and timeline.
Equipment from stock, delivery to the site, incoming inspection.
Mounting, panels, cable, inverters, cabinets, switchboards. Our own crew and machinery.
We check and switch on the plant, set up monitoring and show you how to use it.
Some of our largest plants and storage systems. We will show the other sites on request.
2019
2020
Buy inverters, batteries and solar panels in our online shop with delivery across Ukraine. Equipment for businesses (inverters from 30 kW, high-voltage batteries and energy storage systems, ESS) is selected per project.
Calculate it yourself
Ballpark figures from your data. The exact quote is made by an engineer.
For homes
Panels on the roof, a hybrid inverter and a LiFePO4 battery. By day the house runs on the sun, at night and during outages on the battery.
For installers and dealers
Panels, inverters and batteries from stock, manufacturer's warranty, support from our engineers.
For a 100–500 kW rooftop plant, it takes roughly three weeks to two months from contract to start-up: 1–4 days for the audit and quote, up to a week for supply from stock, 1–5 weeks for installation and about a week for start-up. A multi-megawatt ground-mounted plant takes longer.
The warranty on the equipment we supply is given by us, Sonnen Energy: 10 years on solar panels and 3 years on inverters, batteries and other equipment.
We handle warranty claims ourselves: call or write to us, and we will arrange a replacement or repair anywhere in Ukraine.
We do. We prepare the application for technical conditions, develop the design, get it approved by the distribution system operator, arrange the metering and testing, and see the plant through commissioning. The client signs the documents and receives a finished plant.
For plants that sell their surplus, we arrange active consumer or generating facility status, depending on the capacity and the purpose.
Net billing is a self-generation mechanism for active consumers: the electricity that the plant exports to the grid is credited at the market price and offsets the cost of the electricity consumed. It works for private homes and businesses whose generation is within the permitted capacity.
The terms depend on the contract with the supplier and the current version of the law.
It depends on the tariff, the consumption schedule and the share of generation consumed on site. For a business that works during the day and consumes most of the energy produced, a rooftop solar plant pays back faster than a plant that sells its surplus. Storage adds savings from the price difference between cheap and expensive hours and from peak shaving.
The business calculator will show an indicative payback with the turnkey cost based on your figures. We calculate the exact payback in the quote from your metering data.
Three reasons. Backup: during an outage production does not stop, with switchover in 10 ms. Tariff: the battery charges at night at a lower price and discharges during the day. Peak: the storage shaves the peak consumption that the business pays for by capacity, and lets it avoid expanding its grid connection.
Tell us what kind of site it is and what its connection capacity is.