Skip to content

Turnkey solar plants and energy storage

Shop
Type of site
Weather
Storage

What “turnkey” includes

One contract, one point of responsibility: from technical conditions to service.

  1. Design and permits

    Feasibility study, detailed design, technical conditions, approval by the grid operator.

  2. Equipment from our own stock

    Panels, inverters, batteries and ESS cabinets from our warehouse.

  3. Installation by our own crew

    Mounting, panels, cable, switchboards, ESS cabinets. Our own machinery and people.

  4. Grid connection

    Metering, testing, commissioning, active consumer status.

  5. Warranty

    10 years on panels, 3 years on other equipment. We handle warranty claims.

  6. Service and monitoring

    Generation monitoring, scheduled maintenance and repair anywhere in Ukraine.

How a project runs

Indicative timelines for a 100–500 kW site. Faster for a house, longer for megawatt plants.

  1. 1 1–4 days

    Audit and quote

    Site visit, analysis of a year of consumption, the connection capacity and the space. An offer with equipment and timeline.

  2. 2 up to 1 week

    Supply

    Equipment from stock, delivery to the site, incoming inspection.

  3. 3 1–5 weeks

    Installation

    Mounting, panels, cable, inverters, cabinets, switchboards. Our own crew and machinery.

  4. 4 ≈ 1 week

    Start-up

    We check and switch on the plant, set up monitoring and show you how to use it.

Large projects

Some of our largest plants and storage systems. We will show the other sites on request.

Rows of bifacial panels at the 2.4 MW ground-mounted plant in Ovruch, drone view
Ovruch
Ground-mounted solar plant · Zhytomyr Oblast 2.4 MW solar plant, Ovruch

2019

3.6 MW solar plant

3.6 MW ground-mounted solar power plant, drone view
Power
3.6 MW
Year
2019
Status
Operating

2020

2.2 MW solar plant, Tokmak

Rows of solar panels at the 2.2 MW ground-mounted plant in Tokmak
Power
2.2 MW
Year
2020
Region
Zaporizhzhia Oblast

Equipment from our own stock

Buy inverters, batteries and solar panels in our online shop with delivery across Ukraine. Equipment for businesses (inverters from 30 kW, high-voltage batteries and energy storage systems, ESS) is selected per project.

For homes

A hybrid system for your house: the lights stay on when the grid is down

Panels on the roof, a hybrid inverter and a LiFePO4 battery. By day the house runs on the sun, at night and during outages on the battery.

  • Kits from 5 to 30 kW with a 5–32 kWh battery
  • Installation in 2–4 days, grid connection with our support
  • Warranty of 10 years on panels, 3 years on other equipment

For installers and dealers

Equipment from stock for those who install it themselves

Panels, inverters and batteries from stock, manufacturer's warranty, support from our engineers.

  • Equipment reserved for your project
  • Advice on selection and wiring diagrams
  • Partner application in one day

Frequently asked questions

Didn't find the answer? Give us a call.

+38 067 444 34 34

How long does it take to build a commercial solar plant?

For a 100–500 kW rooftop plant, it takes roughly three weeks to two months from contract to start-up: 1–4 days for the audit and quote, up to a week for supply from stock, 1–5 weeks for installation and about a week for start-up. A multi-megawatt ground-mounted plant takes longer.

What is the warranty on the equipment?

The warranty on the equipment we supply is given by us, Sonnen Energy: 10 years on solar panels and 3 years on inverters, batteries and other equipment.

We handle warranty claims ourselves: call or write to us, and we will arrange a replacement or repair anywhere in Ukraine.

Who handles the grid connection?

We do. We prepare the application for technical conditions, develop the design, get it approved by the distribution system operator, arrange the metering and testing, and see the plant through commissioning. The client signs the documents and receives a finished plant.

For plants that sell their surplus, we arrange active consumer or generating facility status, depending on the capacity and the purpose.

What is net billing, and can I sell my surplus?

Net billing is a self-generation mechanism for active consumers: the electricity that the plant exports to the grid is credited at the market price and offsets the cost of the electricity consumed. It works for private homes and businesses whose generation is within the permitted capacity.

The terms depend on the contract with the supplier and the current version of the law.

What is the payback of a solar plant for a business?

It depends on the tariff, the consumption schedule and the share of generation consumed on site. For a business that works during the day and consumes most of the energy produced, a rooftop solar plant pays back faster than a plant that sells its surplus. Storage adds savings from the price difference between cheap and expensive hours and from peak shaving.

The business calculator will show an indicative payback with the turnkey cost based on your figures. We calculate the exact payback in the quote from your metering data.

Why does a business need storage if it has the grid?

Three reasons. Backup: during an outage production does not stop, with switchover in 10 ms. Tariff: the battery charges at night at a lower price and discharges during the day. Peak: the storage shaves the peak consumption that the business pays for by capacity, and lets it avoid expanding its grid connection.

Get a quote

Tell us what kind of site it is and what its connection capacity is.

  1. 1 We reply within one working day
  2. 2 We clarify the site, consumption and the connection capacity
  3. 3 We send a quote with equipment and lead times within 1–⁠4 days
+38 067 444 34 34 office@sonnen.com.ua

We work across Ukraine

Get a quote