Turnkey construction of energy facilities

Design, equipment from our own stock, installation by our own crew, grid connection and service. From a 10 kW house to a multi-megawatt plant.

Turnkey commercial solar plant

100 kW – 3+ MW

A rooftop plant for self-consumption or a ground-mounted plant for selling energy. One contract covers design, equipment, installation and grid connection.

Energy storage for business

50 kWh – 4+ MWh

Peak shaving, arbitrage between tariff zones, backup during outages, fuller use of your own solar plant. Cabinets from 100 kWh and containers up to 2 MWh.

Hybrid systems

30 kW – 1 MW

For sites that cannot stop: the sun by day, the battery for switchover and the evening, the generator only as the last reserve. Hybrid inverters from 30 to 125 kW.

Home solutions

5–30 kW, battery 5–32 kWh

Panels on the roof, a hybrid inverter and a battery in the boiler room. By day the house runs on the sun, at night and during outages on the battery. Installation takes two to four days.

Design and grid connection

from 10 kW to 3+ MW

Technical conditions, detailed design, approval by the grid operator, testing and metering. As a separate service for sites installed by another contractor, or as part of a turnkey project.

How a project runs

Indicative timelines for a 100–500 kW site. Faster for a house, longer for megawatt plants.

  1. 1 1–4 days

    Audit and quote

    Site visit, analysis of a year of consumption, the connection capacity and the space. An offer with equipment and timeline.

  2. 2 up to 1 week

    Supply

    Equipment from stock, delivery to the site, incoming inspection.

  3. 3 1–5 weeks

    Installation

    Mounting, panels, cable, inverters, cabinets, switchboards. Our own crew and machinery.

  4. 4 ≈ 1 week

    Start-up

    We check and switch on the plant, set up monitoring and show you how to use it.

Large projects

A few of our largest sites. We will show the rest on request.

Zhytomyr Oblast

2.4 MW solar plant, Ovruch

Rows of bifacial panels at the 2.4 MW ground-mounted plant in Ovruch, drone view
Power
2.4 MW
Type
Ground-mounted solar plant
Installation
Our own crew

2019

3.6 MW solar plant

3.6 MW ground-mounted solar power plant, drone view
Power
3.6 MW
Year
2019
Status
Operating

Frequently asked questions

+38 067 444 34 34

How long does it take to build a commercial solar plant?

For a 100–500 kW rooftop plant, it takes roughly three weeks to two months from contract to start-up: 1–4 days for the audit and quote, up to a week for supply from stock, 1–5 weeks for installation and about a week for start-up. A multi-megawatt ground-mounted plant takes longer.

What is the warranty on the equipment?

The warranty on the equipment we supply is given by us, Sonnen Energy: 10 years on solar panels and 3 years on inverters, batteries and other equipment.

We handle warranty claims ourselves: call or write to us, and we will arrange a replacement or repair anywhere in Ukraine.

Who handles the grid connection?

We do. We prepare the application for technical conditions, develop the design, get it approved by the distribution system operator, arrange the metering and testing, and see the plant through commissioning. The client signs the documents and receives a finished plant.

For plants that sell their surplus, we arrange active consumer or generating facility status, depending on the capacity and the purpose.

What is the payback of a solar plant for a business?

It depends on the tariff, the consumption schedule and the share of generation consumed on site. For a business that works during the day and consumes most of the energy produced, a rooftop solar plant pays back faster than a plant that sells its surplus. Storage adds savings from the price difference between cheap and expensive hours and from peak shaving.

The business calculator will show an indicative payback with the turnkey cost based on your figures. We calculate the exact payback in the quote from your metering data.

Get a quote

Tell us what kind of site it is and what its connection capacity is.

  1. 1 We reply within one working day
  2. 2 We clarify the site, consumption and the connection capacity
  3. 3 We send a quote with equipment and lead times within 1–⁠4 days