Skip to content

Service

Turnkey commercial solar power plant

A rooftop plant for self-consumption or a ground-mounted plant for selling energy. One contract covers design, equipment, installation and grid connection.

Power
100 kW – 3+ MW
Who it is for
business owners and directors, chief power engineers, investors in ground-mounted plants
Drone panorama of the 2.4 MW ground-mounted solar plant in Ovruch

What is included

  • Site visit, analysis of a year of consumption and of the connection capacity
  • Feasibility study with generation and payback forecasts
  • Detailed design, technical conditions and approval by the distribution system operator
  • Panels, inverters, DC and AC boards, mounting and cable from stock
  • Installation by our own crew: piles, mounting tables or roof mounting, panels, cable routes, switchboards
  • Testing, metering, commissioning and registration of active consumer status
  • Generation monitoring, scheduled maintenance and repair anywhere in Ukraine

Stages and timelines

Timelines are approximate; the exact ones are fixed in the contract.

  1. 1 1–4 days

    Audit and quote

    Site visit, measurements, analysis of 12 months of bills, calculation of capacity and payback.

  2. 2 up to 1 week

    Supply

    Equipment from stock, delivery to the site, incoming inspection.

  3. 3 1–5 weeks

    Installation

    Mounting, panels, cable routes, inverters and switchboards, earthing. Our own crew and machinery.

  4. 4 ≈ 1 week

    Start-up

    We check and switch on the plant, set up monitoring and show you how to use it.

  • The timelines are for rooftop plants of 100–500 kW.
  • Multi-megawatt ground-mounted plants take longer: more installation work and cable routes.

Who it is for

Businesses that use 100 MWh a year or more and have an unshaded roof or plot: workshops, warehouses, agricultural complexes, shopping centres, logistics. The second group is ground-mounted plants that sell energy. Sites of 10–50 kW are handled under our service for homes and small businesses.

Rooftop or ground-mounted

A rooftop plant needs no land; on a flat roof the mounting is held by ballast, without penetrating the roofing. 1 MW with 650 W panels needs about 1,540 modules and from 6,000 m² of roof. A ground-mounted plant stands on tables with concrete or screw piles; bifacial modules add 5–25% to generation depending on the surface beneath them, as at the 2.4 MW plant in Ovruch.

Equipment

Bifacial 650 W TOPCon modules for ground-mounted tables and roofs. Grid-tie inverters of 30, 50 and 125 kW: the smaller ones for roofs with a complex layout, 125 kW for long rows. The strings run into PV Combiner Box DC cabinets. Everything comes from stock, and we handle the manufacturer's warranty.

Timeline

A 100–500 kW rooftop plant: from contract to start-up roughly three weeks to two months, of which installation takes one to five weeks. A multi-megawatt ground-mounted plant takes longer.

Grid connection and operating mode

After installation we carry out the tests, set up metering and submit the documents to the distribution system operator. A plant for self-consumption works as an active consumer and sells its surplus under net billing; a plant built to sell energy works as a generating facility.

What we need from you

Electricity bills for 12 months, the connection capacity under your contract, and a roof plan or the cadastral number of the plot. We send a quote with equipment, timeline and payback within 1–4 days.

Case study

Rows of bifacial panels at the 2.4 MW ground-mounted plant in Ovruch, drone view
Ovruch
Zhytomyr Oblast 2.4 MW solar plant, Ovruch

A 2.4 MW ground-mounted solar plant in Ovruch, Zhytomyr Oblast: piles, tables, bifacial modules, Bluesun inverters and DC cabinets, cable routes. Built for a client.

Power
2.4 MW
Type
Ground-mounted solar plant
Installation
Our own crew
Read the case study

Frequently asked questions

How long does it take to build a commercial solar plant?

For a 100–500 kW rooftop plant, it takes roughly three weeks to two months from contract to start-up: 1–4 days for the audit and quote, up to a week for supply from stock, 1–5 weeks for installation and about a week for start-up. A multi-megawatt ground-mounted plant takes longer.

What is the warranty on the equipment?

The warranty on the equipment we supply is given by us, Sonnen Energy: 10 years on solar panels and 3 years on inverters, batteries and other equipment.

We handle warranty claims ourselves: call or write to us, and we will arrange a replacement or repair anywhere in Ukraine.

Who handles the grid connection?

We do. We prepare the application for technical conditions, develop the design, get it approved by the distribution system operator, arrange the metering and testing, and see the plant through commissioning. The client signs the documents and receives a finished plant.

For plants that sell their surplus, we arrange active consumer or generating facility status, depending on the capacity and the purpose.

What is the payback of a solar plant for a business?

It depends on the tariff, the consumption schedule and the share of generation consumed on site. For a business that works during the day and consumes most of the energy produced, a rooftop solar plant pays back faster than a plant that sells its surplus. Storage adds savings from the price difference between cheap and expensive hours and from peak shaving.

The business calculator will show an indicative payback with the turnkey cost based on your figures. We calculate the exact payback in the quote from your metering data.

Where do I start if there is no project yet?

Send a request with the type of site, the city and the connection capacity, and for a business, a year of electricity bills. An engineer will call you, visit the site if needed and within a few days send a preliminary quote with equipment, timeline and budget.

Get a quote

Describe the site and its connection capacity.

  1. 1 We reply within one working day
  2. 2 We clarify the site, consumption and the connection capacity
  3. 3 We send a quote with equipment and lead times within 1–⁠4 days
+38 067 444 34 34 office@sonnen.com.ua

We work across Ukraine

Get a quote